Drilling and Production

The Stanley-1, Stanley-2 and Stanley-3 wells have been turned over to production

The Stanley-1 well was drilled in July 2018, As predicted pre-drill, multiple potentially productive hydrocarbon zones were identified within the well-bore. The  production facilities have been upgraded in order to handle the increased fluid volume from Stanley-1. The initial  reports on the produced oil from Stanley-1 were that it was 36.5 degree API gravity crude. Recent analysis suggests that the API gravity is approximately 42 degrees.


The Stanley-2 well was drilled in March 2019, and encountered multiple potential oil and gas bearing reservoirs. The well is flowing oil into the production facilities.


Stanley-3 was the next well  drilled in the project area, in August 2019. Stanley-3 has now been completed as an oil well and has been turned over to production.

From OIL production to sales

Oil is transferred from the on site storage tanks and is ready for transport to market

Stanley-2 Oil Flow

The oil flow from the Stanley 2 well, upon completion of flow testing and after being re-directed into the storage tanks at the production facility