The Stanley-1, Stanley-2, Stanley-3, Stanley-4, Stanley-5 and Charly-1 wells have been turned over to production operations.
The Stanley-1 well was drilled in July 2018, As predicted pre-drill, multiple potentially productive hydrocarbon zones were identified within the well-bore. We are now looking at gas lift re-installation, as this method seems the most suitable for the reservoirs in this well.
The Stanley-2 well was drilled in March 2019, and encountered multiple potential oil and gas bearing reservoirs. The well is on schedule for a planned workover during the upcoming quarter.
Stanley-3 was drilled in August 2019, and was immediately completed as an oil producer. The well was turned over to production in September 2019. It is currently producing oil with the assistance of a jet pump.
Stanley-4 was drilled in September 2020. The well has been completed as an oil producer and has been turned over to production. An additional tank battery was installed adjacent to the well in order to handle the additional production. Stanley 4 is also part of the jet pump evaluation project.
Stanley-5 was also drilled and completed as a multi-zone producing well, and is currently part of the jet pump evaluation project.
Charly-1 was also completed as a multizone oil and gas producer. It is currently producing gas and oil.
Baja has drilled six consecutive and commercial oil and gas discoveries in the Stanley project area, since commencing the drilling program with Stanley-1.
Stanley-3 oil flow into rig tank, prior to connecting the well to the production facility.
Oil is transferred from the on site storage tanks and is ready for transport to market